Skip to content
Field crew recording an excavation trench
Practice · studio work

Seven desks. One recording standard.

Practice is studio work: survey, excavation, monitoring, collections, reporting, and field school. Desk is paid crew filings. Help is questions. Archaeonest is stationed in Jerusalem. We record to the excavation license. We do not issue it.

7 servicesEach has its own page
Jerusalem deskSun–Thu 09:00–17:00 Israel Time
LicenseWe record to it
ArchiveBoxes match the list
Field crew walking a survey transect
Survey

Phase I survey

Pedestrian walkover, shovel testing, and desktop assessment against the license file and historic maps before anyone opens ground.

  • Background against the license file and historic maps
  • Walkover and shovel-test logs with photographs
  • A written recommendation: evaluate, avoid, or close
Open Phase I survey
Open excavation trench with context recording
Excavation

Phase II & III

Evaluation and data recovery with measured contexts, photography, screening, and a Harris matrix another crew can continue.

  • A written research design before ground is opened
  • Context sheets, photographs, and a Harris matrix
  • An assemblage catalog that matches the boxes
Open Phase II & III
Archaeologist monitoring ground-disturbing work
Watch

Monitoring

Watch during open-cut utilities, grading, and demolition. Work stops for features, the record is made, the contractor resumes.

  • Stop-work authority on the machine, in writing
  • Same-day feature records and photographs
  • Daily notes in the project file that night
Open Monitoring
Fragile material packed for conservation
First aid

Field conservation

First aid for fragile and waterlogged material. Packed, labelled, and handed to a conservator with a note on what not to do.

  • Stabilisation only — no field laboratory treatment
  • Packed, labelled, and kept in the right condition
  • A handover note for the named conservator
Open Field conservation
Catalogued finds in labelled boxes
Store

Collections

Cataloguing, condition notes, and museum-ready boxes so a store can take a collection without opening every bag on day one.

  • One numbering system across lots
  • Condition notes and a box plan
  • Photographs so a lot can be found on the shelf
Open Collections
Field drawings and a written report
Grey literature

Reporting

Grey literature, drawings, and a finds list that match the boxes — written to the license and the archive that will take them.

  • A report that matches drawings and photographs
  • A finds list that matches the boxes
  • Written to the license and the named archive
Open Reporting
Students recording a teaching trench
Teaching

Field school

Excavation teaching that still produces a usable archive. Supervisors sign every sheet. A later crew can continue the trench.

  • Signed context sheets, drawings, and photographs
  • Finds packed and numbered for the named archive
  • A file another crew can continue
Open Field school
How a project starts

Site, files, then a written scope.

You do not need a full brief on day one. We will say if the ground does not need a trench.

  1. 01

    A first note

    Site or district, what is already known, the proposed disturbance, and a deadline. A map or photo helps. Protected-site coordinates stay off a first public message.

  2. 02

    Desktop before dirt

    We read the license file and historic maps before anyone puts a shovel in. If a trench would not answer the question, we say so in writing.

  3. 03

    Scope, then the file

    Methods, days, and deliverables go in a written scope. Fieldwork is recorded so another crew can continue the work — context, photograph, and catalog in one file.

Who writes

Directors, stores, engineers, landowners.

If you already have a director, we attach. If you need a season planned, we start from the map. Client names stay off this site.

  • Directors attaching a recording crew
  • Museum and store registrars
  • Engineering teams needing a record before ground is opened
  • Field schools that still have to lodge an archive
  • Labs taking finds from a season they did not dig
  • Landowners with a licensed question
Methods

What goes in the field kit

Written down so another crew can continue the work.

Licensed excavation recording Context sheets & Harris matrix Photography on every locus Sieving as the license requires GPS / GIS mapping Packed for the named archive

We are not the Israel Antiquities Authority. Finds and the record follow the license, the landowner, and the repository agreement.

The site, what you know, and a deadline.

That is enough to start. Crew members who already have a unique ID use Track or Crew access.