Jerusalem · City of David Monday–Saturday, 09:00–17:00 · Sunday closed hello@archaeonest.comContact

Jerusalem field station

The record starts in the stone.

Survey, excavation, and conservation from the field station in Jerusalem. A tracking code opens one assignment. This site does not publish a list of names.

A code begins with AN- and opens one assignment. Seasons are staffed from Jerusalem. Sunday is closed.

Open excavation in the City of David, Jerusalem
City of David, Jerusalem.
Permission firstNo trench opens until the landholder and the antiquities authority for that site have agreed in writing.
City of DavidThe laboratory, the archive, and the crew are at the field station in Jerusalem.
By code onlyNames are not listed. A tracking code from the station opens that one assignment.
Monday to SaturdayThe desk is open 09:00–17:00, Jerusalem time. Sunday is closed. Field reports use the same clock.

What the station takes on

All services
Excavation squares in the City of David, Jerusalem

Survey

Walkover, grid, and instrument survey before anyone opens the ground.

Archaeologists recording walls in an open excavation

Excavation

Hand excavation by context, drawn and photographed while the soil is open.

Clay jars set against a stone wall

Laboratory

Washing, marking, conservation, and a catalogue tied to the context number.

Mosaic floor and columns kept under a museum roof

Collections

Condition, labels, and care for objects that have lost their record. Nothing is offered for sale.

Carved limestone columns in a courtyard

Before design

A written view of the archaeological risk, and the permissions still missing, before anyone fixes a plan.

A group inside a covered excavation

A season’s crew

Field technicians, surveyors, and finds staff hired for the ground in front of the station, not from an open job board.

Jerusalem stone wall and tower beside olive trees
The station, where the day is written down.

A field day

The same order, whatever the trench.

Tools are counted before anyone leaves. A layer is numbered before it is lifted. The note is written the same evening, while the section is still in mind.

  1. MorningYesterday’s context sheet is checked against the plan. The grid for the day is already on paper.
  2. On the groundA bag leaves the trench only with its context number. A photograph is taken before the layer moves.
  3. EveningBags are checked in at the laboratory. The public field report, if a code exists, is cut from that note.

How a context is recorded

The record

This is the sheet. It is blank until the soil is open.

The station does not publish a finished season on this site. What it publishes is the standard: one number, used on the plan, the photograph, the bag, and the laboratory shelf.

A tracking code, issued later, shows the assignment and the field notes. It does not show this sheet, a home address, or a list of names.

Context sheet Jerusalem field station
  1. NumberWritten before the layer is lifted. The same number on the bag.
  2. SquareTied to the site grid. A sketch that cannot be tied to the grid is not filed.
  3. KindA layer, a cut, or a floor. One sheet. One decision.
  4. PlanThe edge, drawn at the scale of the trench, with levels.
  5. SectionDrawn where the sequence still stands, in the same light as the plan.
  6. PhotographOne frame before the layer moves, with a scale and the number in the shot.
  7. BagLeaves the trench only with that number. Checked in at the station the same day.

What the station will not do

No sale of objects

Nothing from a trench, a survey, or a collection check is bought or sold. A request to purchase a find is refused.

No trench without paper

Ground stays closed until the landholder, and the antiquities authority for that site, have agreed in writing.

No date from a snapshot

A photograph can rule things out. A date, a culture, or a value needs the object and, when it exists, the place it came from.

What you leave with

A scope before anyone travels, a code while the crew is out, and a report that can be checked against the bags.

Before anyone travels

A written scope: the question, the area, the crew, and the permissions still missing. No date is firm until that paper exists.

How a season runs

While the crew is out

The code opens the assignment, the status, and the field reports. Times are Jerusalem. A home address is not on the page.

Look up a code

After the last context

The report, the photographs, and a list of what stayed in the ground and what came to the station. The client keeps their copy. The archive stays in Jerusalem.

What we write

Read the practice

All reports

Recording method

Context numbers, plans, sections, and the photograph taken before a layer is lifted.

How a context is recorded

Reports

A walkover note, a season report, or a short identification for a collection.

What we write

Permits

No trench opens until the people who control the land have said yes in writing.

Permissions

Finds

An object stays tied to its context number. The public site does not publish a catalogue or a private find-spot.

The archive

The station

Laboratory, archive, and correspondence share one desk in the City of David. Monday to Saturday, 09:00–17:00.

The Jerusalem station

The desk

Write Monday to Saturday.

09:00–17:00, Jerusalem time. Sunday is closed, so a note sent that day is read on Monday. The first reply names what is still missing. It does not promise a date for the ground.

hello@archaeonest.com

Scopes, reports, and the public website. Name the place in the subject.

Write by email

City of David

Jerusalem field station. The laboratory and the archive are in the same building as the desk.

How to reach the station