01 · The brief
The question, before anyone travels
We agree the question, the boundary, who must be consulted, and what “finished” means. Access, weather, and previous work are on the table before anyone is booked. A letter without a place is answered by asking for one.
02 · The paper
Permission, in writing
No date for the ground is firm until the people who control the land, and the antiquities authority for that site, have agreed in writing. The site does not print a license number in place of that paper.
03 · The first look
Survey before a trench
A walk, a measured sketch, and a decision: survey only, test pits, or open area. The answer is written down so it can be challenged later. A trench the survey does not justify is taken off the page.
04 · Open ground
Recorded while it is visible
Each layer gets a number, a plan, a section where the sequence stands, and a photograph before it is lifted. A bag leaves the trench only with that number. Memory is not a record.
05 · The station
The same evening, in Jerusalem
Bags are checked in at the laboratory. A bag with no number goes back to the person who packed it. The day’s note is written while the section is still in mind. If a code exists, the public field report is cut from that note.
06 · The close
Backfill, then the report
The ground is reinstated as agreed. The report follows the catalogue, not the other way around. The client keeps their copy. The sheets, the photographs, and the bags stay where the written agreement says they stay, with an archive copy at the station.